PROTON META POWER 5-Star Programme to enhance manufacturing operations

Proton has launched a new operational framework aimed at raising manufacturing quality and production output at its manufacturing complex in Tanjung Malim, Perak. Known as the PROTON META POWER 5-Star Programme (PMP), the initiative is starting off as a pilot project at the dedicated Electric Vehicle plant within the complex before being introduced in other manufacturing divisions.

Designed around accountability from the factory floor and structured capability building, the PMP framework builds directly upon the existing PROTON Production Way (PPW). While PPW establishes baseline standards across 8 operational pillars — ranging from safety and 5S to equipment control and built-in quality — the new programme shifts greater focus onto individual and team ownership during daily shifts.

Greater worker involvement
Under this system, line workers have greater involvement in ensuring quality. They are expected to inspect their own work to stop defects before they move down the assembly line, maintain their assigned equipment, and identify process bottlenecks rather than working around them.

“Advanced technology supports us, but our success ultimately depends on our people — their skills, care and commitment to doing every job well,” said Dr. Li Chunrong, Chief Executive Officer of Proton. “PROTON META POWER builds on our existing foundation by developing our people and teams, strengthening problem-solving and recognising progress.”

Proton factory

5-Star Team assessment model
Central to the programme is the 5-Star Team assessment model. Rather than relying solely on top-down directives, the system evaluates teams against fixed benchmarks in workplace safety, product quality, cost efficiency, equipment reliability, delivery performance, and skill development. Supervisors and managers are tasked with coaching their respective teams and addressing technical issues raised on the floor.

To ensure feedback from the factory floor leads to measurable adjustments, the programme integrates formal reporting channels alongside established lean manufacturing practices like Kaizen, Autonomous Maintenance, and Innovative and Creative Circles. Workers can submit operational concerns through Problem-Solving Tickets or communicate directly with management via the Heart & Voice Community, which requires documented responses and follow-up actions.

Beyond internal production measurements, the upskilling component aligns with Malaysia’s broader push for Technical and Vocational Education and Training (TVET), preparing local technicians for the specific assembly requirements of next-generation and electrified vehicles.

Full implementation by October 2027
Following completion of the initial 5-Star Team pilot assessment at the EV plant by December 2026, PROTON will begin to expand the programme in other areas, with full 5-Star operational capability across the whole complex to be established by October 2027.

Facebook (Proton Cars Official)

Instagram (Proton Cars)

YouTube (Proton Interactive)

 

PROTON’s evolution from domestic manufacturer to regional production hub for Geely

Latest Stories